My Sourcing

LanguageEnglish

Please enter a valid keyword with 2 or more characters / numbers.

MGM Industries & Company
Enquire
MGM Industries & Company

MGM Industries & Company

Hong Kong

Buying Office, Export Agent, Exporter

Average Response Time

Within 24 hours

Disclaimer

Some links on this website may take you to other third-party sites and you acknowledge and agree that HKTDC and the HKTDC Affiliates have no responsibility for the accuracy or availability of any information provided by those linked websites.

Links to other websites do not constitute an endorsement by HKTDC of such websites or the Information, products, advertising, or other materials available on those websites.

Share this page
Smoke Fog Disinfection Spray Machine
Share this page
Production Lead Time:
15 day(s)
Model No.:
2020051503
Size:
30 x 28 x 18 cm
Port:
Hong Kong
Type of Payment:
T/T, PayPal
Minimum Order Quantity:
500 set(s)
Description
Contact Supplier
Description
Smoke Fog Machine Disinfection Spray Machine

​Spraying antibacterial disinfection machine steps:
  • Step 1: start the car, the car is inside the cycle, the wind speed is 3 files, and the cold air is opened. Power on the machine into the front passenger seat row and open the red switch button on the back of the machine.
  • Step 2: Wait for 5 minutes for preheating, wait until the handle light is on. Then press the timer switch (4 ml to 100 ml of potion. Please set 4 or more below 80 ml.)
  • Step 3: Atomization for about 3 to 5 minutes, the liquid medicine is sprayed off the machine, take out the machine, continue the inner circulation for about 15 minutes, let it fully absorb.
  • Step 4: ventilate, cycle outside for 3 minutes, the entire construction is completed, check the switch off and deliver.
Tips:
  • After the machine is finished, it is best to use a clear water spray. Keep the machine piping clean and unobstructed to prevent blockages from affecting machine operation.
Cleaning function:
  • Connect the machine to the power supply, press the black switch to the left cleaning position, turn the timing knob to about 2 steps, and rinse the machine pipe with clean water or clean tap water.

#covid19medical


MGM Industries & Company

MGM Industries & Company

Hong Kong

Buying Office, Export Agent, Exporter

Average Response Time

Within 24 hours

You may also like

Unfollow the following supplier?